HomeSitemap Contact Us
Home >     News     >     Advanced Grounding Avoidance System on BP Shipping vessel
Your name  
Your Email    
Friend's name  
Friend's Email    
Advanced Grounding Avoidance System on BP Shipping vessel
June 07, 2009

 Drydocks World-Dubai, the region’s premier ship repair, conversion and new building yard and subsidiary of Drydocks World, has installed a trial version of a Grounding Avoidance System on the 46,803-tonne oil tanker, British Tenacity for BP Shipping.   The installation of such a system on a sea vessel is an industry first.

 

Personnel from Drydocks World-Dubai worked for 12 days to modify British Tenacity’s bow and fabricate the structures required to accommodate the system’s transducers and a new Navigation Display System on the vessel. Drydocks World-Dubai’s advanced fabrication workshop, one of the largest of its kind in the region, used approximately 11 tonnes of Grade A steel to fabricate the refurbished bow area.

 

The Grounding Avoidance System, developed by Marine Electronics Ltd. in conjunction with BP Shipping, is a three-dimensional, forward-looking sonar system that helps identify obstacles anywhere in the water column up to a range of one kilometre. 

 

Nawal Saigal, Managing Director, Drydocks World - Dubai, said: “This is a proud moment for us. The cooperation with BP Shipping in installing the advanced Grounding Avoidance System was a unique opportunity for Drydocks World-Dubai to prove its capability in handling complex and sophisticated engineering assignments. The forthcoming Nor-Shipping 2009 in Oslo, offers an important platform for Drydocks World to highlight this achievement and many more across our yards.”

 

This technology – which is being trialed - was installed on the vessel, with the project completed ahead of the Nor-Shipping 2009 international ship building exhibition and maritime conference. The conference – which will be held in Oslo, Norway, from June 9-12 - will see Drydocks World showcase its world-class services across the Middle East and Southeast Asia regions.

 

The completion of this technical operation marks a new milestone in Drydocks World-Dubai’s growth graph and has reaffirmed the yard’s capability to undertake and execute challenging maritime engineering assignments with competence.