Client:  Saipem Energy Services SpA
Project:  Tanker Betatank II to FPSO Firenze
Project Status:  Ongoing
Project Scope:
  • Removal and safe disposal of asbestos from accommodation, engine room and pump room.
  • Internal tank treatment and routine dry docking.
  • Complete refurbishment of accommodation block.
  • Fabricating new steel structures for module supports, pipe rack, heli-deck, lay down areas and installation of flare stack.
  • Installing new crude lines on the deck, installing and connecting the metering skid with hook up to the tandem offloading system.
  • Modifying existing boilers from bunker oil firing to natural gas firing.
  • Modifying the cargo systems and upgrading cargo control room equipment.
  • Upgrading of fire fighting system, cooling system, Inert Gas and venting system.
  • Upgrading of power generation system, lighting and communication systems.
  • Installing new Fire and Gas alarm and public address system.
  • Fabricating, installing and integrating an external turret.

Back


Client:  Saipem SpA for Sonangol
Project:  VLCC Magdeline to FPSO Gimboa
Project Duration: July 2006 - September 2008
Project Scope:
  • Removal and safe disposal of asbestos, fabricating and installing spread mooring system and riser balconies.
  • Installing new crude lines on the deck; installing and connecting the metering skid with hook up to the tandem offloading system.
  • Fabricating and installing flare tower, a pipe rack running on the centre line, module supports and 12 production modules.
  • Laying new gas lines from the bow to the pressure reducing station on deck and further to the boilers in engine room. Modifying existing boilers to dual fired ones.
  • Modifying the cargo systems. Upgrading Cargo control room equipment.
  • Fabricating and installing heli-deck.
  • Installing new Fire and Gas alarm system and Emergency shutdown system.
  • Complete refurbishment of accommodation block.
  • Internal tank treatment and routine dry docking for a 15-year system.
  • Installing a spread mooring system and riser balconies.
  • Stripping and renewal of accommodation.

Back


Client:  Saipem SpA for Petrobras
Project:  VLCC Margaux to FPSO Cidade de Vitoria
Project Duration: July 2005 - June 2007
Project Scope: 
  • Removal and safe disposal of asbestos.
  • Fabricating and installing spread mooring system and riser balconies.
  • Installing new crude lines on the deck, installing and connecting the metering skid with hook up to the tandem offloading system.
  • Fabricating and installing flare tower.
  • Fabricating and installing a pipe rack running on the centre line.
  • Fabricating and installing module supports.
  • Laying new gas lines from the bow to the pressure reducing station on deck and further to the boilers in Engine room.
  • Modifying existing boilers to dual fired ones.
  • Modifying cargo systems.
  • Upgrading Cargo control room equipment.
  • Fabricating and installing a heli-deck.
  • Installing new fire and gas alarm system and Emergency shutdown system.
  • Internal tank treatment and routine dry docking for a 15-year system.
  • Steel structures weighing 4500 tonnes were added.
  • Accommodation was stripped out and refitted with increased capacity.
  • Twelve modules were installed, the heaviest being the Injection Gas Compression Module weighing around 1400 tonnes.

Back


Client:  SBM IMODCO for Chevron
Project:  VLCC Lu San to FPSO Frade
Project Duration: December 2006 - January 2009
Project Scope: 
  • Removal and safe disposal of asbestos.
  • Fabricating and installing internal turret and moon pool.
  • Fabricating internal turret using approximately 3500 tonnes of steel.
  • Installing new crude lines on deck.
  • Installing and connecting metering skid with hook up to the tandem offloading system, fabricating and installing flare tower and a marine pipe rack running on the centre line.
  • Installing module supports and production modules.
  • Laying new gas lines from bow to pressure reducing station on deck and further to boilers in engine room.
  • Modifying existing boilers to dual fired ones; cargo systems upgrade.
  • Upgrading cargo control room equipment.
  • Fabricating and installing heli-deck.
  • Installing new Fire and Gas alarm system and Emergency shutdown system.
  • Stripping and refitting accommodation and new HVAC system.
  • Treating internal tank bottom and deck-head and routine dry docking for a 15-year system.
  • Steel structures weighing 5000 tonnes were installed.
  • Stripping and renewal of Accommodation.
  • Installing 14 modules; the heaviest being the Production Separation Module that weighs around 1400 tonnes.
  • Fabricating, installing and integrating internal turret.
  • Approximately 13 million man hours were consumed.

Back


Client:  SBM Offshore N.V. and Sonangol for Exxon Mobil Corporation
Project:  VLCC Mosocean into FPSO Xikomba
Project Status: Project completed in 2003
Project Scope: 
  • The topsides consisting of 16 main modules varying in weight from 170t to 1,100t were installed on board.
  • Installing and integrating external turret.
  • Accommodation facilities that can be can house 85 people.
  • The facilities added contain the central control and radio rooms.
  • The facilities including 10in production risers and two 8in water injection risers, an 8in gas injection riser and three umbilicals were added.
  • The swivel stack consists of a 6in gas injection, HP utility, electric, LP utility, 6in pigging and 10in water injection swivels. There are also two 12-production lines and two 12in test lines.
  • All related piping and electrical installation was carried out.

Back


Client:  Single Buoy Moorings Inc.
Project:  Conventional VLCC to FPSO Atlantic
Project Duration: 2002 - 2003
Project Scope: 
  • Removal and safe disposal of asbestos.
  • Installing a purpose built bow mounted turret.
  • Installing new crude lines on the deck.
  • Installing and connecting the metering skid with hook up to the tandem offloading system.
  • Fabricating and installing flare tower, a pipe rack running on the centre line.
  • Installing module supports.
  • Laying new gas lines from the bow to the pressure reducing station on deck and further to the boilers in Engine room.
  • Modifying existing boilers to dual fired ones and modifying cargo systems.
  • Upgrading the cargo control room equipment.
  • Fabricating and installing the heli-deck.
  • Installing new Fire and Gas alarm system and Emergency shutdown system.
  • Refurbishment of the accommodation block.
  • Internal tank treatment and routine dry docking for a 15-year system.
  • Installation and hook up of 20 modules the heaviest is the Injection Gas Compression Module weighing 1000 tonnes.
  • Installing traveling crane of 30 tonnes lifting capacity on Pipe rack.
  • Installing deck crane of 45 tonnes lifting capacity for handing supply.
  • Installing Incinerator.
  • New steel structures were coated.
  • Tank coating - Cargo tank bottom and full ballast tanks and slop tanks were coated covering approximately 110,000m2 of surface area.
  • A total of 20 km of pipes were laid (7 km for topside pipes).

Back


Client:  Single Buoy Moorings Inc.
Project:  Conventional Crude Carrier Stena Contender to FSO Nkossa1
Project Year: 1996
Project Scope: 
  • Installing a purpose built bow mounted turret.
  • Installing new crude lines on the deck.
  • Installing and connecting the metering skid with hook up to the tandem offloading system.
  • Laying new gas lines from the bow to the pressure reducing station on deck and further to the boilers in Engine room.
  • Modifying existing boilers to dual fired ones.
  • Modifying cargo systems.
  • Upgrading the Cargo control room equipment.
  • Fabricating and installing heli-deck and boarding facilities.
  • Installing new Fire and gas alarm system and Emergency shut down system.
  • Refurbishment of the accommodation block.
  • Internal tank treatment and routine dry docking for a 10-year system.
  • Project/quality and safety management.

Back


Client:  Saipem, ENI/Single Buoy Moorings Inc.
Project:  Conventional medium size crude tanker to FPSO Mystras II
Project Duration: 2002 - 2003
Project Scope: 
  • Removal and safe disposal of asbestos.
  • Fabricating and installing spread mooring system and riser balconies.
  • Fabricating and installing sponson tanks on either side of vessel.
  • Installing new crude lines on the deck, installing and connecting the metering skid with hook up to the tandem offloading system.
  • Fabricating and installing flare tower, a pipe rack running on the centre line.
  • Installing module supports and 16 production modules.
  • Laying new gas lines from the bow to the pressure reducing station on deck and further to the boilers in Engine room.
  • Modifying existing boilers to dual fired ones and modifying cargo systems.
  • Upgrading cargo control room equipment.
  • Fabricating and installing heli-deck.
  • Installing new fire and gas alarm system and emergency shutdown system.
  • Complete refurbishment of the accommodation block.
  • Internal tank treatment and routine dry docking for a 15-year system.
  • Around 1000 tonnes of steel was refurbished.

Back


Client:  Fred Olsen Production AS for Canadian Natural Resources Limited
Project:  VLCC to FPSO Knock Allan
Project Duration: September 2007 – December 2008
Project Scope: 
  • Extending accommodation for 60 people and Deck Crane (PS).
  • Fabricating and installing the following: sea water pump room (4-P Ballast tank), module supports, heli-deck, 53 metres high flare tower, 16 chain stoppers, riser porch, offloading manifold and Fire Diesel Engine room Fwd (Fore Peak Tank); Fuel gas, steam line, HP and LP flare line, Condensate line, Fresh water line; Switchgear and Transformers and Power Generator Module.
  • Installing metering skid, glycol storage tank skid, glycol contactor & K.O Drum skid; three Deck Boilers of capacity 63 tonnes/hr dual fuel; Process Modules; four HP Gas Compressor Modules; new air conditioning plant including compressors, condensers, and air handling units; new Sewage Treatment Plant (STP); import and offloading pipelines and fire and foam lines; two floodlight posts.
  • Upgrading CCTV, PA/GA and Communication and Navigation systems.
  • Renewal of tanks with approximately 50 tonnes of steel and pipes on tanks/deck.
  • Installing double valve separation.
  • Coating of 11 cargo tanks, surface area of around 30,000m2 approximately, in addition to slop tanks (P/S); four ballast tanks, full tank excluding deck head area covering an area of approximately 24000m2; forepeak tank and fresh water tanks (P/S) and external hull, accommodation and main deck.
  • Fabricating and installing a power generation module.

Back


Client:  Fred Olsen Production A.S. for Addax Petroleum and Sinopec
Project:  VLCC Elgreco to FPSO Knock Adoon
Project Duration: 2005 - 2006
Project Scope: 
  • Upgrading accommodation from 30 people to that for 100 people.
  • Installing 14 chain stoppers, 3 process modules, inlet skid, K.O. drum, manifold skid and export metering skid.
  • Fabricating and installing flare tower, heli-deck, two offloading platforms, two import riser porches and water injection manifold.
  • Installing deck crane, booster skid, turbo alternator, FW generator, new diesel generator, diesel driven forward fire pump and five cooling pumps.

  • Installing new deck boiler and converting existing boiler for dual fuel firing.

  • Electrical work involved installing HV, MV and LV switchboard, fire and gas system, PA/GA system, navigational system and tank temperature and pressure monitoring system.

  • Refurbishment work involved, tank internal steel work, engine room, pump room and accommodation work and tank internal coating work.

  • Steel renewal of approximately 500 tonnes.

  • Coating of cargo and ballast tanks.

  • Refurbishment in engine room and pump room.

  • Up-grading accommodation for 30 people to 100 people.

  • Fabricating and installing 14 chain stoppers.

  • Installing new deck mounted boiler and converting existing boiler for dual fuel firing.

  • Installing and hook-up of 2 process modules, 1 water injection module, inlet skid, K.O. drum, manifold skid, booster skid and export metering skid.

  • Fabricating and installing Flare tower.

  • Fabricating and installing heli-deck.

  • Fabricating and installing two offloading platforms, a water injection platform and two import riser porches.

  • Installing new equipment such as Turbo alternator, condenser, FW generator, calorifier, Foam system, 5 process and condenser cooling pumps, sewage treatment plant, incinerator and compactor.

  • Major piping work was carried out with lines for offloading, water injection, water, loading & discharge, steam and condensate, instrument air and fire.

  • Major electrical work included installing HV/MV/LV switchboards, transformers.

  • Approximately 70 km of cables were used.

  • Installing new PA/GA, telephone, F&G system and ESD system.

Back


Client:  FPSOcean
Project:  Shuttle tanker to FPSO Deep Producer I
Project Duration: March 2007 to January 2009
Project Scope: 
  • Fabricating four new thruster compartments and installing new non-retractable Azimuth thrusters.
  • Modifying vessel’s mid ship for installing new moon pool and renewing approximately 1000 tonnes of steel.
  • Fabricating and installing a swivel room above the Moon Pool structure for equipment related to the DRB (Disconnectable Riser Buoy) including gantry structures, winches and hydraulics.
  • Installing owner supplied Process and Power modules and related process piping and cabling work on deck.
  • Cargo and ballast tank-coating.
  • Fabricating and installing new offloading platform, heli-deck and Emergency Generator Room.